Skip to Content
  • Secured Headstones
  • Memorials
  • Memorial Anchor
  • Monuments
  • NAMM tested
  • Memorial Lok-Down
  • Head Stones in Stoke on Trent

Nettlebank Ltd

02 - Sep - 2010

Insert Business Description...

How Lok-Down Works

How to Use The Lok-Down ground Anchor

Fitting A Memorial

Drill one 28mm hole in the centre of the base for the Lok-Down fitting.

This works the same if the 28mm hole is drilled 3" either side of centre.

Lay the foundation slab.

Knock in the ground anchor to set height.

Place the memorial with the base attached onto the foundation slab.

Align the 28mm hole in the granite base with the hole in the foundation slab.

Screw the Lok-Down fitting onto the ground anchor and tighten.

Knock the plastic cover into the 28mm hole.

Fixing is now complete and the memorial can be tested instantly.

To Remove The Memorial

Break the plastic cap and unscrew the Lok-Down fitting.

The memorial is now free to take away.

Click here for link to video and pictorial instructions

  • Nettlebank Lok-Down Anchor
  • Lok-Down in Stoke on Trent
  • Memorial Services in Stoke on Trent
  • Memorial Services
  • Nettlebank Services
  • Lok-Down in North Staffordshire
  • Headstone Ingraving